Skip to content
XSIS

NVIDIA

Partner

We size and build GPU estates on NVIDIA for training and inference, then prove the stack under a real workload.

What We Do on NVIDIA

An NVIDIA engagement starts with the workload. We size the graphics processor (GPU) estate from your models, data and response times. Then we design compute, networking, storage, power and cooling as one system, because a fast card on a slow network wastes its speed. The work ends with a measured test, not a delivery note.

The named engagements are a capacity model, a cluster design, a model-serving service and a utilisation review. CUDA, the programming toolkit models use, is part of the stack we test. NVIDIA NIM packages inference services that can run inside your environment. We exercise the whole path before handover.

You provide the models you intend to run, the data they use and the latency each service needs. You decide where the estate sits and who may use it. You receive a capacity model, a tested deployment and a monitoring plan.

Where These Projects Go Wrong

GPU projects fail on the same three points. Each is measurable before the hardware is ordered.

  • Capacity Bought by the Card

    Teams buy GPUs without matching them to the model or the load. We size from measured workloads, then plan headroom for peaks.

  • Utilisation Is Invisible

    Cards sit idle while one team queues and another holds capacity. We add scheduling, quotas and a use report with named owners.

  • The Stack Is Untested

    A cluster is handed over before the model runs at the promised speed. We test with a real workload and record the result before handover.

How a Project Starts

The opening weeks turn models and response times into a capacity number.

  1. Model the Workload

    We review the models, data and response times you need. You receive a capacity model and a constraint list. You decide which workload proves the design.

  2. Design the Estate

    We design compute, network, storage, power and cooling as one system. The load test plan is part of the design. You approve it before purchase.

  3. Run the Load Test

    We deploy the stack and run the chosen workload under load. You receive the measured throughput and the monitoring plan. You decide whether to scale.

Questions

The questions buyers bring to a first NVIDIA discussion.

How do you decide how many GPUs we need?

We model the models, data and response times you need. A test workload shows the real use before you commit to a larger estate.

Can the estate run in our own data centre?

Yes. We design for your data centre or a private cloud. Power, cooling and network are part of the design.

How do we stop teams competing for capacity?

We add scheduling, quotas and a use report with named owners. Each team sees the capacity it holds.

Can we run several models on one estate?

Yes. We plan for current models and expected ones. Serving and scheduling keep them apart.

How do you protect the models and data?

Access runs through your identity provider, data stays in your environment, and every model call is logged. We test the controls before handover.

Talk to Our Team

Tell us what you run today and what should change. An engineer answers with the next step.